WELCOME to the Website of
Yacht 'EMERALD.H.D.'
|
|
Some photos to give some updates
Constructing the canopy coaming. This was made and in place before the Flexiteek was laid on deck.
Companionway Drop Boards
Tiller ready to fit
Cockpit well and hatch
Forward sole
Saloon sole
Forward bunk area
Heads area housing also the holding tank, sink, cupboard & mirror
Slide the shelf back, slide the sink forward, perfect!
Starboard locker housing fuel tank, Morse controls & storage
Shore power connection aft
Winch handle pockets in place
12v lighting installed. All cables are housed in conduits marked 12v and 240v respectively
Aft locker through deckfittings
.
Bow anchor locker through deckfittings
Navigation area prior to fitting radio & chartplotter
Cupboard where compass is, visible down below and on deck
Sound insulation for the engine compartment
Looking down into the Gas locker, on deck.
Saloon Door, recycling an old porthole and replace glass with mirror both sides
Door to Forward Bunk, also recycling an old porthole and replacing glass with mirror both sides. The mirrors being different magnification
Looking all ship shape and ready to launch soon
.
more to follow soon as she is launched for final work to be completed and Mast etc installed .....
|
|